Plumbing pipes...which way does it go?? |
Master bath sink plumbing |
Down the drain... master shower |
Kitchen sink |
Laundry Room plumbing |
Red hot/ Blue cold Master shower |
Gravel goes in first ! |
Lots of gravel! |
Hall bath tub.... funny how you have to get those tubs in before everything else! |
The concrete is stamped and release is applied to stamping to give it colors. |
Can't wait for you to come over and sit awhile. The concrete on ground is foundation for steps |
This is a picture of the stamps. They are rubber and are oddly shaped. You lay on wet concrete and tamp the design in the porch. |
Sweeping off release before sealer is applied. This process takes several days |
Electricians arrived! Thanks to O D Hawkins for doing a great job! |
Ceiling - light mounting box |
Concrete is cut to avoid cracking and enhance design |
Perfect squares! Good job Dale! |
Ready for sealer. |
Cool shot...between the floors. |
Whoops! Milo popped in to say hello to you! |
With sealer! Really brings out color in concrete! |
Looks great! Interesting and lengthy concrete process, but it is beautiful and now covered with felt so it won't get paint, gunk and mud on it! Thanks to Dale, Rick, Dennis and Joe for a great job. |
The good folks at Spencer Heating and Air have been here! |
Dale Looney modeling his "Fresh Air Attire" while spraying FoamOne Spray Foam Insulation in our house! |